Commercial / EPC

Deployable Solar Infrastructure for Projects Where Land, Labor, and Time Matter.

1 MW

in roughly 1.3 acres

Factory-built platform architecture

Reduced site work & mobilization

Solar + Battery + Optional Water

High-density Eagle configurations

U.S.-fabricated steel options available

Traditional Solar Is Not the Right Fit for Every Site

Land, labor, schedule, and site disruption stall more commercial solar projects than technology ever does.

Land

Usable acreage is limited or expensive to develop.

Labor

Field crews and wage exposure drive up cost and risk.

Schedule

Long construction timelines delay revenue & operation.

Site Disruption

Civil work and heavy equipment disrupt active sites.

Why EPCs, Developers & C&I Buyers Care

Land

Eagle is designed for high-density solar layouts where conventional ground mount consumes too much usable acreage — 1MW fits in 1.3 acres.

Labor

Factory-built structural work can reduce the amount of assembly performed on site and improve control on wage-sensitive projects.

Schedule

Compact delivery and repeatable deployment can shorten the path from mobilization to operating power.

Project Control

A repeatable platform reduces field-built variables, weather exposure, and heavy-equipment dependency in most configurations.

Flexibility

Choose Eagle for infrastructure scale, Hawk for mobile field power, or Sparrow for compact and distributed commercial loads.

Power + Water

Pair solar and storage with Altitude Water systems where the project requires both energy and water resilience.

The Right Platform for the Job

Eagle™

Commercial / EPC Anchor

High-density C&I solar, public works, municipal sites, EV charging, water systems, microgrids, land-constrained projects. Use the 1MW/1.3-acre scenario only with the approved site-specific caveat.

Hawk™

Mobile commercial / field power

Construction, remote operations, temporary infrastructure, disaster response, mobile EV support, and Power + Water.

Sparrow™

Compact / Distributed

Temporary construction power, remote billboards, cell towers, events, small commercial loads, distributed field operations, rural facilities.

From factory-built platform to operating asset.

Winged Solar arrives as a complete deployable system—not a pile of field-assembled parts. Transport, unload, deploy, connect, and power up with a small crew.

Transport

Arrive

Deploy

Operate

Commercial Applications

Land-constrained commercial and industrial properties

Solar EPC and developer projects requiring a differentiated product approach

Municipal, public works, school, and community infrastructure projects

EV charging sites where utility upgrades are slow, expensive, or insufficient

Temporary construction power and remote project sites

Agriculture, pumping, cold storage, and remote equipment loads

Remote billboards, cell towers, communications assets, and distributed loads

Water systems and Power + Water deployments

Move More Repeatable Work Into the Factory.

Two ways Winged Solar supports labor-sensitive and domestic-content project requirements.

Wage-Sensitive Project Strategy

Reduced on-site construction activity labor classification confirmed per project, not guaranteed.

U.S.-Steel / Domestic-Content Strategy


U.S.-fabricated steel to support domestic-content strategies where eligible.

Bring the site, load, and constraints. We will help identify the platform.

Tell us about the site, load profile, available land, utility limitations, project schedule, storage requirements, and whether Power + Water is part of the plan. We will help determine whether Eagle, Hawk, Sparrow, or a combined configuration is the right fit.
Scroll to Top