Eagle™

High-Density Solar Infrastructure for C&I and Land-Constrained Projects.
Winged Solar Eagle high-density deployable solar infrastructure platform

~13.65 kW

Typical Current Configuration

~675 sq ft

unit footprint

~1 MW / 1.3 ac

typical layout target

A ground-mount alternative when the site is constrained.

Built for projects where land, labor, or schedule rule out a conventional ground mount.

Land-constrained C&I sites

Municipal and public works projects

EV charging depots with limited land

Microgrids and battery-backed infrastructure

Water systems and Power + Water configurations

Remote commercial and industrial loads

More solar capacity per usable acre.

A representative Eagle layout can support approximately 1 MW in approximately 1.3 acres. Actual capacity and acreage depend on final engineering, access, spacing, setbacks, topography, drainage, fire-lane, and AHJ requirements.

Reduce field work. Reduce site variables. Improve project control.

Moving repeatable structural work into the factory changes what happens on site.

Reduced on-site structure assembly

Reduced heavy-equipment dependency in many deployments

Potential reduction in prevailing-wage labor exposure compared with field-built systems

Repeatable product platform for EPCs and developers

U.S.-fabricated steel structure options available for domestic-content strategies

Winged Solar factory-built platform compared with conventional ground mount

Build

Factory-building the Winged Solar platform — Build step

Ship

Shipping the folded Winged Solar platform to site — Ship step

Deploy

Deploying the Winged Solar platform on site — Deploy step

Power

Eagle specification snapshot

Current structure concept: approx. 27.9 ft length × 24.6 ft depth × 11.2 ft high

Minimum service lane clearance in current datasheet: approx. 9.7 ft

Designed for site-specific wind, seismic, and snow-load requirements

Compatible with solar + storage + microgrid applications

Optional battery / ESS and power electronics configurations

Deployment is approximately one hour with two technicians after placement, subject to connection, anchoring, commissioning, and site conditions.

Bring your site, load, and land constraints. We'll help you plan the layout.

Scroll to Top