Commercial / EPC
1 MW
in roughly 1.3 acres
Factory-built platform architecture
Reduced site work & mobilization
Solar + Battery + Optional Water
High-density Eagle configurations
U.S.-fabricated steel options available
Traditional Solar Is Not the Right Fit for Every Site
Land
Usable acreage is limited or expensive to develop.
Labor
Field crews and wage exposure drive up cost and risk.
Schedule
Long construction timelines delay revenue & operation.
Site Disruption
Civil work and heavy equipment disrupt active sites.
Why EPCs, Developers & C&I Buyers Care
Land
Eagle is designed for high-density solar layouts where conventional ground mount consumes too much usable acreage — 1MW fits in 1.3 acres.
Labor
Factory-built structural work can reduce the amount of assembly performed on site and improve control on wage-sensitive projects.
Schedule
Compact delivery and repeatable deployment can shorten the path from mobilization to operating power.
Project Control
A repeatable platform reduces field-built variables, weather exposure, and heavy-equipment dependency in most configurations.
Flexibility
Choose Eagle for infrastructure scale, Hawk for mobile field power, or Sparrow for compact and distributed commercial loads.
Power + Water
Pair solar and storage with Altitude Water systems where the project requires both energy and water resilience.
The Right Platform for the Job
Eagle™
Commercial / EPC Anchor
Hawk™
Mobile commercial / field power
Sparrow™
Compact / Distributed
From factory-built platform to operating asset.

Transport

Arrive

Deploy

Operate
Commercial Applications
Land-constrained commercial and industrial properties
Solar EPC and developer projects requiring a differentiated product approach
Municipal, public works, school, and community infrastructure projects
EV charging sites where utility upgrades are slow, expensive, or insufficient
Temporary construction power and remote project sites
Agriculture, pumping, cold storage, and remote equipment loads
Remote billboards, cell towers, communications assets, and distributed loads
Water systems and Power + Water deployments
Move More Repeatable Work Into the Factory.
Wage-Sensitive Project Strategy
Reduced on-site construction activity labor classification confirmed per project, not guaranteed.
U.S.-Steel / Domestic-Content Strategy
U.S.-fabricated steel to support domestic-content strategies where eligible.